With the submarine cable transit project between Lapseki and Sütlüce, 154 KW Switchyards and Terrestrial Cable Junction Centers on both sides of our company made by Soil problems in Lapseki and Sütlüce locations were corrected with the JET-GROUT application and made ready for construction.
2013
Reinforced Concrete and Steel
9.700.000,00 TL
10.000 m2