The construction of 15 Distribution Centers and 10.000 mt of MV Cable Tramline lines within the scope of energy infrastructure installation works of Çerkezköy OSB.
Project Date
2016
CARRIER SYSTEM
Reinforced Concrete and Steel
CONTRACT PRICE
8.400.000,00 TL
TOTAL CLOSED AREA
10.000 m2