SIEMENS

ENERGY

ÇERKEZKÖY O.S.B.

ELECTRICAL INFRASTRUCTURE PROJECT

The construction of 15 Distribution Centers and 10.000 mt of MV Cable Tramline lines within the scope of energy infrastructure installation works of Çerkezköy OSB.

 

Project Date

2016


CARRIER SYSTEM

Reinforced Concrete and Steel


CONTRACT PRICE

8.400.000,00 TL


TOTAL CLOSED AREA

10.000 m2


en_GBEnglish