Bridge electricity distribution buildings and tranche lines on Altınova and Dilovası sides were built by our company. In addition, VMS and VTS information constructions on the Bridge were completed within the scope of this work.
2015
Reinforced Concrete – Steel
3.950.000,00 TL
2.000 m2