BORUSAN GAZİANTEP-KARTALDAĞI

22 TURBUNLÜ 66 MW
WIND ENERGY POWER PLANT (WPP) PROJECT

Borusan Gaziantep RES Projesi

From the Wind Turbines of the Gaziantep-Kartaldağı WPP Project to the Switchyard; the Construction of a 154 KW Switchyard with Control Building together with the construction of the shaving lines.

 

Project Date

2016


CARRIER SYSTEM

Reinforced Concrete and Steel


CONTRACT PRICE

2.710.000,00 TL


TOTAL CLOSED AREA

5500 m2