From the Wind Turbines of the Gaziantep-Kartaldağı WPP Project to the Switchyard; the Construction of a 154 KW Switchyard with Control Building together with the construction of the shaving lines.
2016
Reinforced Concrete and Steel
2.710.000,00 TL
5500 m2