Construction of 5 Distribution Centers, and 6.000 mt of MV Cable Tramline lines within the scope of energy infrastructure installation works of Aydın Ortaklar OSB.
2015
Reinforced Concrete – Steel
1.450.000,00 TL
4000 m2