SIEMENS

ENERGY

BORUSAN – BALABANLI

BORUSAN – BALABANLI 51 MW WITH 17 TURBUNES
WIND ENERGY POWER PLANT (WPP) PROJECT

With the infrastructure of 17 turbines Together, the Tramline lines and 154 KW Switchyard were built by our company. Together with the infrastructure of 17 Tribunes, the Tramline lines and 154 KW Switchyard were built by our company.

 

Project Date

2013


CARRIER SYSTEM

Reinforced Concrete and Steel


CONTRACT PRICE

4.700.000,00 TL


TOTAL CLOSED AREA

6500 m2